The Phantom Delay: Why Your Schedule Says "Go" but Your Site Says "Stop"
It’s the scenario every Project Manager dreads.
It’s Tuesday morning. Your P6 schedule says the tracker installation for Block 4 starts today. The subcontractor is mobilized. The machinery is running. The Daily Progress Report (DPR) says you are green for the week.
But there’s a problem: The trackers aren’t there.
You call Procurement. They tell you the ERP shows the materials were ordered months ago, but the delivery date slipped. You call Logistics. They tell you the shipment is stuck at the port.
Your schedule is green. Your budget is red (because you’re now paying for idle crews). And your data lied to you.
The Four Walls of a Solar Project
We often talk about "project visibility," but the reality on most renewable sites is that critical data is trapped in four distinct, soundproof rooms:
The Schedule Silo (P6/MSP): The optimistic plan of what should happen.
The Engineering Silo (CAD): The technical plan of where it should happen.
The Procurement Silo (ERP): The financial record of what was bought.
The Field Silo (Apps/Clipboards): The messy reality of what actually happened.
The Dangerous Gap Between P6 and ERP
The most expensive disconnect is usually between your Schedule (P6) and your Procurement (ERP).
P6 is often a work of fiction. It assumes materials arrive exactly when the logic tie says they will. Meanwhile, your ERP lives in transactional reality—it knows about lead time changes, partial shipments, and vendor delays.
Because these two systems don’t talk, your planner is manually updating the schedule based on week-old emails. By the time the schedule reflects the procurement delay, it’s too late to re-sequence the work.
The Cost of "I Didn't Know"
When data is disconnected, you pay a "Coordination Tax" on every MW installed:
Idle Labor: Crews waiting for material that the schedule said was available.
Reactive Logistics: Paying expedited shipping fees because inventory wasn't tracked against the install rate.
The "End-of-Job" Scramble: Trying to reconcile four different spreadsheets to close out the project.
You can't build a connected energy grid with disconnected data. It’s time to knock down the walls between the trailer, the warehouse, and the boardroom.